It has been 8 months since my last post on the construction of our beach cabin.  My computer died and I was unable to get to my blog to do an update.  I now have a new computer and I am able, once again, to gain administrative access to my blog.  So let me bring you up to date on our construction.

 Ian cutting out doors and windows

Plywood siding going on the front and back of the cabin


Interior walls and mezzanine floor joists shown below


Installation of the metal roof panels below








Framing of the front upper deck above

 

Installation of the building wrap below


Installation of the waterproof vinyl on front decks 



All doors and windows are installed




We are now attempting to get the exterior siding on before the rains begin.  More later...




 

Thursday, January 26, 2023

 Ian and I have made a little progress on our beach cabin.  Here is the latest:

Installing the drain line from the home to the septic tank

 The steel I-beams are in place on the concrete piers

Placing the floor joists


                                              Tarp in place and ready for the rain

 

Steel ribs in place and ready to lift one side

                                                             Raising the ribs


Raising the 2x6 walls



That is today's update.  More later...